When it comes to installation of a ducted air conditioning system, setting up of the duct network is one of the most important tasks. In fact, the success or failure of a ducted air conditioning system will depend upon the accuracy with which the ductwork is set up.
The ductwork has to be perfect so that the cool air is distributed uniformly to every nook and cranny of the area under the influence of the air conditioning system. On this page, let us discuss the steps that the professionals take to set up the ductwork, during ducted air conditioning installation in Wollongong.
Field Measurement
This is the first and foremost step that experts will take, prior to setting up the ductwork of the AC system. While conducting the field measurement, the experts will measure the distance between the location of the ventilation system and the column. They will also measure the distance between the partition wall and the outer wall and the height of the roof from the floor and the height of the floor from the ground, if the building is multistoried.
The experts offering air conditioning installation in Shellharbour will measure the thickness of the walls, including that of the external wall, the partition wall, the height of the doors & windows, the cross sectional size of columns, the distance between the bottom of the beam and the flat floors.
All these measurements will help the experts come up with a perfect ductwork, cut to measurement, depending on the dimension of the total area.
Sketching
Once the measurements have been done, it is time for the experts to get to the drawing board. Depending on the series of measurements already taken, the technicians will make elaborative sketches before the ductwork is fabricated.
Sheet Correction
This step follows once the ductwork has been fabricated in accordance to the drawing, While conducting sheet correction, steel coil levelling machines are used to correct the coils. For correction of the steel plates, repeated bending with multiple rollers is used. However, the bending deformations of the flat plates are corrected by manual correction, through hammering by the experts offering air conditioning installation in Nowra.
Underlining:
This is all about determining the thickness of the plate, keeping in consideration the design and the dimension of the air pipe, selecting the number of bent pipes, as well as the interface mode.
Once underlining is done, blanking of the ducting is carried out, followed by the closing of the air duct. Closing of the air duct involves sealing the air ducts so that they open up only and only to the air vents and to ensure there is no leakage that can act as an escape route of the air.
Remember, only a flawless ductwork will help you make the most of the ducted air conditioning system. That is the reason the professionals offering air conditioning supply in Shellharbour will come up with such a flawless setting up of the ductwork.
Our experts at MAZ Airconditioning will do the same, turning out to be one of the most acclaimed AC installation companies in and around Sydney. Call us to book a service or schedule a meeting with our experts.